All Videos
Browse By TagBrowse By Tag
All Videos-
-
09:22
-
U.S. Finishing / Cone Mills
Asbestos and an underground chemical plume containing chromium warranted a Time Critical Removal Action by EPA at a former textile mill near Greenville, SC.
-
-
-
31:01
-
Environmental Response News Magazine #10
EPA’s response to the devastating Midwest Floods of 1997 is featured. "Site Shorts" updates the demolition of an asbestos plant along with an emergency response exercise in a Hawaiian highway tunnel and a drum site excavation. Flywheel technology is also presented..(1998)
-
-
-
13:00
-
Asbestos: Managing Problems, Addressing Concerns
This video illustrates the asbestos containment process during abatement, reuse of the contaminated water for removal operations, and strategies for working with local communities to increase communication. (1999)
-
-
-
30:25
-
Environmental Response News Magazine #6
One of the largest Superfund cleanups in Louisiana is featured, along with the Superfund Accelerated Cleanup Model (SACM) . "Site Shorts" features EPA Regions 3,4, and 6. (1995)
-
-
-
12:14
-
Li Tungsten Superfund Site
Waste from this abandoned 26 acre tungsten manufacturing site in Glen Cove, NY affected the towns waterfront. Hazardous waste included asbestos, radioactive ore, and multiple contaminated reaction vessels. (1998)
-